| 
	
 1- Location  
It was established by presidential decree 
(249/1977) and amended by presidential decree (567/1980). It is located on Cairo 
– Ismailia desert road, 49.3 Km from Cairo. 
2- General plan 
The total area of the city  is 94.8 thousand 
acres of which 80  thousand acres are an urban community   
(Residential areas - services – industrial -   tourism and recreation 
....) 
3- Housing sector 
-The total number of  housing units is 
194133 of which 
 26104 
implemented  by New Urban Communities Authority  
18738 national housing projects 
 13922 
implemented  by (Housing Financing Fund- Cooperatives- Housing and 
Development Bank )  and  
166501 units + 2918 ( private sector ) 
7623 units for new social housing projects . 
One million housing units 
project : 
43460 housing 
units are being implemented.  
Build your own house: 
Total number of plots in the city are 16 
thousand. 
Total units which have been allocated 
15950 
Total units which have been licensed 15834 
Dar Masr : 
Phase 1  2832 
units ( 118 buildings ) 
Phase 2 1800 units ( 75 buildings ) 
Population: 
Current   :  650 thousand  
inhabitants 
Target     :  2.1  million  
inhabitants in 2023 
4- Services  sector 
Total 428 
-The number of  
service buildings implemented  by New Urban Communities Authority is 
268 : 
-In addition to 160 buildings implemented  
by private sector  . 
5- Utilities and infrastructure sector 
Drinking water: 
- The city is fed with water by 2 purification 
plants with total capacity of 570 thousand m 3 /   day , wells plant 
with the capacity of 20 thousand m 3 / day . 
- A water purification station with the capacity 
of 600 thousand m 3 / day is under   construction . 
- Length of finished   water networks: 1282.564  
km. 
- Length of finished   irrigation networks: 113.5  
km. 
Sanitation: 
-  2 aerated oxidization ponds with the 
capacity of 190 thousand M3/d have been   implemented . 
- 3 non aerated ponds with the capacity of 100 
thousand m3/day with a total surface of 120 feddans have been implemented to 
serve heavy industries area . 
-Completion of  a mechanical treatment plant 
with the capacity of 286 thousand m3/d. 
- Length of finished networks: 712.23 km 
Electricity: 
-  9 electric stations with the capacity of
  1005  M. F. A   have 
been  finished. 
- Length of finished networks: 6894 km. 
- total 4 dispensers  
Roads and communications: 
-Length of finished road networks: 695 km. 
-Length of finished communication networks 1080 
7km. 
- 3 new locations for communication centers  
- Installation of 
MSAN  of 120 thousands 
Agriculture: 
It includes cultivation of green areas , 
forestation of roads and a park( 90 acres )  
6- Industry sector 
-There are 2056  producing factories  with 
31.4   billion pounds as an 
investment capital, with an annual production of 34.7
 billion pounds which  provided 
353656  jobs paying 18.3  million pounds 
annually. 
-There are 1083 factories under construction  
with an investment capital of 1028  million 
pounds and an annual production value  of 2.70
 billion pounds which will provide 5374
 jobs paying
 55.5  million pounds annually. 
7- Investments 
22.9 billion pounds including: 
- Housing sector         
: 8.1 million pounds 
- Utilities sector           
: 13.9    billion pounds 
- Services  sector           : 7161.1 
million pounds 
- Agriculture  sector      :  144.8 million 
pounds 
  
 |