1-Location
It was established by
presidential decree (96/1999) on an area of 3900 acres
which was raised to 18490.92 acres by cabinet decree (807/2015)
. It is located on the west bank of the River Nile. It is 12 Km
far away from Aswan city.
2- General plan
-The total area of the city
is 22390.9 thousand acres of which 3.3 thousand acres are urban
community .
3- Housing sector
-The number of
housing units implemented by
New Urban Communities Authority is 280 developed housing units.
- The number of
housing units implemented
Ebny baitak project are 2886
housing units.Total number of plots in the city
is 3530
• Completion of the implementation of 2,600 units and
finishing the number of 1420 units and the implementation of the number
of 1860 units of social housing
• The total number of plots of housing in the city is 1735
(socio-economic - medium - villas
- Special - home house) - and the number of 1447 pieces
National project( ebny baitak ).
Population:
Target
is 850 thousand inhabitants
by 2023..
4-Services sector
-The number of
service buildings
implemented (not operated
yet ) by New Urban
Communities Authority is 26
( 4 nurseries – post
office - mosque - preparatory school- 2 health units - 4 shopping malls )
- (fire and police building –urban health center- store
building- emergency building
) are being implemented.
5- Utilities and infrastructure sector
Drinking water:
-6 drinking water
wells have been implemented to feed the emergency phase to supply the
city with the capacity of 5 thousand m3 / day.
-A mobile water plant
with the capacity of 100 m3 / hour has been implemented .
- the first phase of the drinking water treatment plant with
the capacity of 25 thousand m 3 / day has been
implemented.
- Length of finished networks: 137
km.
Sanitation:
- The first stage of the oxidation ponds with the capacity of
18 thousand m3 / day has
been implemented to treat sanitary water .
- A main lifting
plant with the capacity of 20 thousand m3 / day
, a sub- lifting plant (1) with the capacity of 15 thousand m3 /
day and a sub- lifting plant (2) with the capacity of 20 thousand m3 /
day have been implemented .
- Length of finished networks: 66.6
km.
Electricity:
- A
transformer station with the capacity of 100 M. F. A
is being implemented.
- Length of finished networks: 690.8
km.
Roads and communications:
-Length of finished road networks: 73.76 km.
-Length of finished communication networks: 127.55
km.
6-Investments
2.3
billion
- Housing sector
: 747 million pounds
- Utilities sector
: 1.1 billion pounds
Agriculture sector : 17.8
million
- Service sector
: 350.3 million pounds
ا
|